New Facility Update 12-3-2014

We have been making some good progress. Electric and data are being installed and scheduled for a rough-in tomorrow. More photos of the inside of the building are coming soon!

400 Amp Meter Can
400 Amp Meter Can

 

This is the epicenter of the new building. The radiant floor heat is on and running great. This system was designed and installed by us. It will allow us to maintain that critical temperature control for perfect bonding even in the winter!

Radiant Floor Heating System
Radiant Floor Heating System

 

We were also able to get the front entrance concrete poured a few weeks ago. Here are some pictures of that.

 

Posted on Leave a comment

Update 11-07-2014

We have started the installation of the radiant barrier and the exterior metal on the building. You can really get a feel for the size of the building now! Once we get the metal completed we will be starting on the electrical rough in.

Posted on Leave a comment

New Facility Update 10-30-2014

As most of you probably know, we are in the process of building a new manufacturing facility! This new facility will allow us to step up production in a major way. The demand for our products has grow to the scale that we needed to make this move. With new equipment and more space, we can take it to the next level! We broke ground in early October 2014. As of today 10-30-2014 we are no longer taking new orders. We are focusing on completion of our new building and getting our new equipment installed and running. We anticipate production to start again in the first quarter of 2015. Make sure to keep tabs on our website and our facebook page!