New Facility Update 12-3-2014

We have been making some good progress. Electric and data are being installed and scheduled for a rough-in tomorrow. More photos of the inside of the building are coming soon!

400 Amp Meter Can
400 Amp Meter Can

 

This is the epicenter of the new building. The radiant floor heat is on and running great. This system was designed and installed by us. It will allow us to maintain that critical temperature control for perfect bonding even in the winter!

Radiant Floor Heating System
Radiant Floor Heating System

 

We were also able to get the front entrance concrete poured a few weeks ago. Here are some pictures of that.

 